|  |
 |  Over 110 commercial and military aviation-related projects ($~3.5 billion in the last 50 years) |
 |  Long-span designs up to 820 feet |
 |  New and renovated terminals featuring high-profile architecture, transparent blast protection, efficient layouts, etc. |
 |  Hangar facilities for storage, painting, and maintenance of aircraft as large as Boeing 747 and Airbus A380 |
 |  Specialized structures for fatigue/stress testing, simulator training, heavy equipment, and assembly |
 |  Designs for 24/7 operations and ease of constructability (including mega-lift structures) |
 |  Developer of TSA blast protection provisions outlined in 2006 Airport Planning and Design Guidelines |