Phased 8,547-m² (92,000-ft²) update and expansion of a two-story airport terminal, adding gates, holding rooms, baggage screening, and lobby space—designed for future growth of up to 50% more space. A complete seismic analysis of the combined existing and expanded facility verified discrete locations for structural strengthening elements to allow unimpeded phased expansion with a fully operational airport.
ARCHITECT: AECOM