Three-story, 74,322-m² (800,000-ft²) design/build, renovation and modernization of the western half of Terminal 3. The project includes upgrades to the existing five domestic gates along the western face to allow flexibility to accommodate both international and domestic flights with a combination of up to three wide-bodied aircraft swing gates and up to five domestic gates capable of accommodating narrow-bodied aircraft; upgrades to the interior of Boarding Area F; a consolidated Baggage Handling System; a new sterile connector to International Boarding area G; and replacement of the full façade of Terminal 3.
ARCHITECT: Gensler