Levi's Stadium

Team

Architect

HNTB

Contractor

Turner | Devcon JV

Stats

PROJECT TYPE

Sports

COMPLETION

2014

PROJECT SIZE

1.9 million ft²

MKA ROLE

Structural Engineer

Santa Clara, CA

Levi's Stadium

This 75,000-seat facility serves the San Francisco 49ers and represents the first new NFL stadium to be certified LEED Gold. MKA explored 66 structural design alternatives before settling on the most efficient and cost-effective option—an all-steel frame with Buckling-Restrained Braces (BRBs) to address the area’s intense seismic demands and reduce foundation costs by 20 percent.  This compact and lightweight structural system of 529 BRBs arranged in U-shaped “brace cores” is designed to absorb seismic forces and reduce potential building damage during an earthquake.  The framework also addresses tight site constraints by allowing the concourse to cantilever 40 ft off the stadium structure to provide column-free space below.
Levi's Stadium_Credit Jim Simmons_Twilight Exterior.jpg
Levis Stadium _MKA_MD_ exterior from parking lot - announcement image.jpg
Levis Stadium _MKA_MD_ exterior looking up to name.jpg
Levis Stadium _MKA_MD_ gren roof looking N.jpg
Levis Stadium _MKA_MD_ Inside bowl looking across mid-field.jpg
90341_00_N92_edit.jpg
Levi's Stadium_Credit Jim Simmons_Twilight Exterior.jpg

Levi's Stadium

Awards

Best U.S. Project Over $150M - Structural Engineers Association of Illinois

Sports Facility of the Year - Sports Business Journal

Back to top